New Jersey Fence: 60 cm wide at the bottom and 87 cm high
Construction is located in the Pakistan Karachi-Lahore Expressway Project, which is constructed by the 20th Bureau of China Railway, with a total length of 145 km. Shi
During the construction process, the local continuous high temperature, the highest temperature up to 52 degrees Celsius, NC-1300 is still sustainable operation, to ensure that the construction on schedule.


